input:length(5,"均線期數");
//input:hpercent(2,"H%");
//input:lpercent(2,"L%");
//plot1(average(close,length)*(1+hpercent/100),"正乖離");
//plot2(average(close,length)*(1-lpercent/100),"負乖離");
plot1(average(close,length)*1.04,"+4%");
plot2(average(close,length)*1.02,"+2%");
plot3(average(close,length)*0.98,"-2%");
plot4(average(close,length)*0.96,"-4%");
簡單的將5日均線+-2、4%畫出4條線,改變K線圖的顯示日期區間,畫面上顯示的數值都是對的,但是畫出的4條線位置在某些顯示日期區間就是不對
7 評論